Burhaniye (BALIKESİR) Transmission Line, Reservoir and Network Project

 Location: Balıkesir
 Date: – 

Due to the deficiency in the present drinking water system, of The County, Burhaniye, the project of transmission line and distribution network for the demand for the projection year, 2041.

OWNER OF THE PROJECT 
General Directorate of Bank of Provinces

FINANCIER OF THE PROJECT 
General Directorate of Bank of Provinces

 

DESCRIPTION OF THE PROJECT
The drinking water demand of the County, Burhaniye is currently being supplied by six present deep wells. In the new Project, the demand is planned to be supplied by the six present wells for the first 15-year-long period. After that date, the present resources would not be sufficient fo the demand and the alternative resources would be taken into consideration.
In the Project, the transmission line is composed of pipes with diameters of Ø110, Ø140, Ø160, Ø200, Ø225, Ø280, Ø355, Ø400, Ø450, Ø500, Ø630, Ø710 mm and the length of 270 km for the first phase and 70 km for the second phase.

Project Total Population : 193,400 ca
Project Total Flowrate : 455 l/s

Site varsayılanı