Due to the deficiency in the present drinking water system, of The County, Burhaniye, the project of transmission line and distribution network for the demand for the projection year, 2041.

OWNER OF THE PROJECT 
General Directorate of Bank of Provinces

FINANCIER OF THE PROJECT 
General Directorate of Bank of Provinces

 

DESCRIPTION OF THE PROJECT
The drinking water demand of the County, Burhaniye is currently being supplied by six present deep wells. In the new Project, the demand is planned to be supplied by the six present wells for the first 15-year-long period. After that date, the present resources would not be sufficient fo the demand and the alternative resources would be taken into consideration.
In the Project, the transmission line is composed of pipes with diameters of Ø110, Ø140, Ø160, Ø200, Ø225, Ø280, Ø355, Ø400, Ø450, Ø500, Ø630, Ø710 mm and the length of 270 km for the first phase and 70 km for the second phase.

Project Total Population : 193,400 ca
Project Total Flowrate : 455 l/s

Site varsayılanı

No Comments so far

PeterblitoPosted on  2:13 pm - Apr 16, 2019

Excellent content. Cheers.
http://cialismsnrx.com/
cialis 5 mg come cura
buy cialis online
121doc cialis generico
buy cialis online

Your comment is awaiting moderation.

MarcussibPosted on  6:29 am - Apr 17, 2019

Whoa tons of beneficial facts.
http://cialisttk.com/
cialis prospecto vademecum cheap cialis levitra vs cialis dosage cialis 20 mg
warnings for cialis
experience with cialis
cialis mg does come
cialis erregung
effet secondaire du cialis 5mg
cialis 20mg einnahme

Your comment is awaiting moderation.