Davutlar-Güzelçamlı (AYDIN) Sewerage Project

 Location: Aydın
 Date: – 

The project of the wastewater collection network system of the Counties, Davutlar – Güzelçamlı. 

OWNER OF THE PROJECT 
General Directorate of Bank of Provinces

FINANCIER OF THE PROJECT 
General Directorate of Bank of Provinces

DESCRIPTION OF THE PROJECT
Considering the topographical structure of the area and approved site works and the fact that the treatment of the wastewater collected from both Counties is included in KUŞATAK Project, the transmission of wastewater to wastewater treatment plant is projected by using four separate pumping stations; three of them in the collector line, one of them in transmission line to the plant.
In the Project, the collector line and the network are composed of pipes with diameters of Ø200, Ø300, Ø400, Ø500, Ø600, Ø700, Ø800, Ø1000, Ø1200 mm and the total length of 158 km for the first phase and 210 km for the second phase.

Project Total Population : 171,000 ca
Project Total Flowrate : 550 l/s 
Total Collector Line : 25,200 m