Şiran Belenli Pond and Irrigation Project

 Project Location : Gümüşhane

 Date: 2017

 

OWNER OF THE PROJECT

22th Regional Directorate of State Hydraulic Works

FINANCIER OF THE PROJECT

General Directorate of State Hydraulic Works

DESCRIPTION OF PROJECT:

In the project, the technical and economic aspects of all the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.), hydrology, agricultural economy and expropriation studies, resolution of the drainage problem of the areas with drainage deficiencies, irrigation of the irrigable part of the irrigated land, It is aimed to In the project; Hydrology, agricultural economy and expropriation studies, all of the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.) are considered to be suitable for the technical and economical aspects of the project. Technical report at the technical level. The project site is located at 1/25 000 scale H41-C2, H41-C3, H42-D1 ve H42-D4 TRABZON  die plate.

The project area is located in Babacan Village of Gumushane Province Şiran District in the south of the Black Sea region.

Şiran Babacan Pond and Irrigation Project

 Project Location : Gümüşhane

 Date: 2017

 

OWNER OF THE PROJECT

22th Regional Directorate of State Hydraulic Works

FINANCIER OF THE PROJECT

General Directorate of State Hydraulic Works

DESCRIPTION OF PROJECT:

In the project, the technical and economic aspects of all the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.), hydrology, agricultural economy and expropriation studies, resolution of the drainage problem of the areas with drainage deficiencies, irrigation of the irrigable part of the irrigated land, It is aimed to In the project; Hydrology, agricultural economy and expropriation studies, all of the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.) are considered to be suitable for the technical and economical aspects of the project. Technical report at the technical level. The project site is located at 1/25 000 scale H41-C2, H41-C3, H42-D1 ve H42-D4 TRABZON  die plate.

The project area is located in Babacan Village of Gumushane Province Şiran District in the south of the Black Sea region.

Torul Büyükçit Pond and Irrigation Project

Project Location : Gümüşhane

 Date: 2017

 

OWNER OF THE PROJECT

22th Regional Directorate of State Hydraulic Works

FINANCIER OF THE PROJECT

General Directorate of State Hydraulic Works

DESCRIPTION OF PROJECT:

In the project, the technical and economic aspects of all the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.), hydrology, agricultural economy and expropriation studies, resolution of the drainage problem of the areas with drainage deficiencies, irrigation of the irrigable part of the irrigated land, It is aimed to In the project; Hydrology, agricultural economy and expropriation studies, all of the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.) are considered to be suitable for the technical and economical aspects of the project. Technical report at the technical level. The project site is located at 1/25 000 scale G42-D2 TRABZON  die plate.

The project area is located in Buyukçit Village of Gumushane Province Torul District in the south of the Black Sea region.

Kürtün Köyiçi Pond and Irrigation Project

Project Location : Gümüşhane

 Date: 2017

 

OWNER OF THE PROJECT

22th Regional Directorate of State Hydraulic Works

FINANCIER OF THE PROJECT

General Directorate of State Hydraulic Works

DESCRIPTION OF PROJECT:

In the project, the technical and economic aspects of all the facilities in the project (body, tunnel conduit, spillway, irrigation network, etc.), hydrology, agricultural economy and expropriation studies, resolution of the drainage problem of the areas with drainage deficiencies, irrigation of the irrigable part of the irrigated land, It is aimed to propose the construction of a technical report at the technical level.

The project area is located in the Köyiçi Village of the Kürtün town of Gümüşhane in the south of the Black Sea region. The project site is located at 1/25 000 scale G42-D2 TRABZON  die plate.

The land survey of the area which is planned to be done on the Gön Stream and which is thought to be watered by Kürtün – Köyiçi Pond has been made and 150 ha soil source has been determined as irrigable. Based on the planning studies, it was determined that Gön Stream’s water potential could be watered up to a maximum gross 114 ha net 100 hectare area from the Köyiçi Pond when the operational pressure to be formed in the minimum water elevation and the existing projects in the vicinity were taken into consideration.

 It is aimed to irrigate about 75 hectares of land belonging to Melikli, Yukarıuluköy and Ortaköy districts of Gümüşhane province Kürtün County with Köyiçi Pond.

 

Road Projects

Road Projects

 

 ANTALYA – Manavgat – Başlar-İbradı Seperation Road Project

 

 

 

 

 

 

 Atkaracalar – Kurşunlu – Ilgaz State Highway Project

Details

 

 

 

 

 

 

 KARABÜK– Yenice – Devrek –ZONGULDAK Seperation Road Project

 

 

 

 

 

 

 

 Yenice (KARABÜK) City Transition Project

 

 

 

 

 

 

 

 Cizre – ŞIRNAK State Highway and ŞIRNAK Belt Highway Project

 

 

 

 

 

 

 Senirkent-Yalvaç Sep.- Çay-Dinar Sep. Provincial Road Project

 

 

 

 

 

 

 ŞANLIURFA State Highway Project

Details

 

 

 

 

 

                  Refahiye-Kemah Road Project

                 Details

 

 

 

 

 

 

 

 

 

 Kuşadası – Kirazlıköy – Çamlık Road Project

 

 

 

 

 

 

 

 KKTC Gazimagusa-Geçitkale – Ercan Sep. Yenierenköy Road Project

 

 

 

 

 

 

Nazilli(AYDIN)-Bozdoğan Sep. Kemer Dam Provincial Road Project